1. If the mainshock happens before 3 days after the foreshock the b_max of the period is b_max_first.¶
2. If the mainshock happens before the scheduled deadline (e.g., before 90 days) from the mainshock, the b_max of the whole period is not calculated (e.g., b_max90=nan).¶